The Malir Expressway is a major infrastructure project currently under development in Karachi, Pakistan’s largest city and economic hub. This ambitious undertaking aims to revolutionize transportation in the metropolis, addressing longstanding issues of traffic congestion and improving connectivity between key areas of the city.

The Malir Expressway is designed to be a 38.75-kilometer-long high-speed corridor that will connect several important locations in Karachi. The project is divided into multiple phases and is expected to significantly reduce travel times across the city.

Key Features:

  • Length: 38.75 kilometers
  • Type: 6-lane expressway
  • Speed Limit: Expected to be 100 km/h
  • Interchanges: Multiple interchanges planned along the route

Route and Connectivity

The Malir Expressway will connect various strategic points in Karachi:

  1. Starting point: Near Jam Sadiq Bridge in Korangi
  2. Ending point: Connection to the Karachi-Hyderabad Motorway (M9)

Key Areas Connected:

  • DHA City Karachi
  • Jinnah International Airport
  • Bahria Town Karachi
  • Super Highway (M9 Motorway)

Project Status and Timeline

As of 2023, the Malir Expressway is still under construction. The project has faced some delays and controversies, but work is progressing.

  • Project Announcement: 2015
  • Construction Start: 2021
  • Expected Completion: To be confirmed (initially planned for 2024)

Impact on Karachi’s Transportation

The Malir Expressway is expected to have a significant impact on Karachi’s transportation system:

  1. Reduced Travel Time: The expressway will cut travel time between DHA City and central Karachi from 1 hour to about 25 minutes.
  2. Improved Connectivity: Better access to key areas like the airport, DHA City, and Bahria Town.
  3. Traffic Decongestion: Expected to alleviate traffic on existing routes like Shahrah-e-Faisal.
  4. Economic Benefits: Improved transportation infrastructure could boost economic activities in connected areas.

Interchanges and Access Points

The Malir Expressway will feature several interchanges to provide access to key areas:

  1. DHA City Interchange
  2. Jinnah Avenue Interchange
  3. Airport Interchange
  4. Malir Cantt Interchange
  5. Shah Faisal Colony Interchange

Environmental and Social Considerations

The project has faced some criticism and concerns:

  1. Environmental Impact: Concerns about the expressway’s effect on the Malir River ecosystem.
  2. Land Acquisition: Issues related to the acquisition of land for the project.
  3. Displacement: Concerns about the displacement of local communities.

Future Developments and Connected Projects

The Malir Expressway is part of a larger vision for improving Karachi’s infrastructure:

  1. Integration with Karachi Circular Railway (KCR)
  2. Connection to the Lyari Expressway
  3. Potential extension to Port Qasim

Malir Expressway

The Malir Expressway Karachi is a 39km road to be constructed along the Malir River starting from KPT Interchange, crossing through Qayyumabad and concluding at the Karachi-Hyderabad Motorway near Kathore. It will be a four-lane carriageway. Its original estimated completion period is three years.

Etihad Town Phase 2 Prices 2024

Malir Expressway connects ARY laguna DHA city to Karachi by motorway, get Malir expressway map and latest news of construction and project completion updates, ARY Laguna is located opposite to Bahria Town Karachi on Superhighway, DHA Phase 9, DHA City Sector 1 Karachi.

Check out our more articles

Malir Expressway Map

Given the proposed Malir Expressway map, Malir Expressway will be the shortest alternative route to M-9 Motorway from DHA Karachi. It will be designed for speedy yet safe travel from the urban areas of the city to nearby villages. 

Presently, besides the two causeways on the left and right banks of Malir River, there are no paved roads present for a quick and smooth commute. The two causeways connect with the National Highway (N-5) and Quaidabad, respectively. 

For further assistance on the location and Malir Expressway route map, please have a look at the Malir Expressway map below:

Malir Expressway route map

Following are the both Malir expressway new route map and map of this project.

Malir Expressway completion date

Malir Expressway’s inauguration date was 10 Dec 2020 and this will be completed within 3-5 years. Malir Expressway project will be completed in 2023-2025.

Malir Expressway Inauguration Date 10 Dec 2020

Chairman Bilawal Bhutto Zardari will lay the foundation stone of Malir Expressway in the same month
The Malir Expressway will be a 39.4 km long beautiful road.

Malir Expressway cost and budget

The cost of Malir Expressway is more than Rs. 27 billion.

Conclusion

The Malir Expressway represents a significant step in addressing Karachi’s transportation challenges. While the project has faced delays and controversies, its completion is eagerly anticipated by many residents who hope it will ease their daily commutes and improve the city’s overall connectivity. As the project progresses, it will be crucial to address environmental and social concerns to ensure its long-term success and sustainability.

For the most up-to-date information on the Malir Expressway project, residents are advised to check official government sources and reputable news outlets.